Our Projects
Mulberry Place

Location: Tower Hamlets
Contract Length: 1 Week
Services: Town Hall
Chiller replacement with short section of chilled pipework, insulated with mineral fibre insulation and weather protected with wraptec 0.8 polyisobutylene sheeting. No need for solvent welds with wraptec as it sticks to itself and is very pliable, valve was insulated in one piece.