Our Projects

Location: Southend
Contract Length: 4 Weeks
The extract ductwork was condensating on the inside of the duct and the moisture was running back into the flats. Insulation was used to prevent warm air of the flats meeting the cold air of the outside therefore preventing the condensation. Metal cladding was used to protect the insulation from bird attacks