Location: Ardingly College

Contract Length: 4 months

Services: Thermal Insulation

A new science block was built among the existing science block, main service pipe was installed in floor voids and insulated with phenolic insulation.  The internal ductwork was insulated with mineral fibre with the external covered in venture clad.  The main plantroom insulation was covered with metal cladding.